Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.11851901
![](http://i.b2b168.com/e/tag_pthy.gif)
- Product Categories
- Friendly Links
- home > Supply > Supply Foshan factory steel casing which can be processed? Foshan thick-walled steel plant can produce up to more than most of the thick steel pipe
Supply Foshan factory steel casing which can be processed? Foshan thick-walled steel plant can produce up to more than most of the thick steel pipe
Information Name: | Supply Foshan factory steel casing which can be processed? Foshan thick-walled steel plant can produce up to more than most of the thick steel pipe |
Published: | 2014-12-26 |
Validity: | 300000 |
Specifications: | 219 * 6273 * 8325 * 10 426 529 * 6630 * 5720 * 6820 * 7920 * 81 020 * 101 120 * 121 220 * 141 320 * 161 420 * 181 520 * 20 |
Quantity: | 1000.00 |
Price Description: | |
Detailed Product Description: | Liu Bao six Tel: 18033242424 188231022101. First make sure the former steel coil tube plate thickness, material must meet the design requirements. Must be reasonable under the steel material cutting, reduce waste materials, such as steel cutting when using oxyacetylene cutting mouth clean to be processed. When steel groove, using angle grinder for grinding. 2. When steel coil tube, to make die according to the diameter size. Roll board must be installed in place of acceptance, distribution boxes and cables subject to temporary power specifications. Such as the use of electric hoist, electric hoist can be used after harvest qualified experience. Roll plate machine running noise to be monitored environmental protection department. 3. Group reel, the first reel to be corrected, inspection perimeter diameter. Must correctly when using the hand hammer, nighttime construction noise note shall not affect the residents. Pipeline welding, diffusion of smoke is very important, especially welded pipe wall, make sure the welder does not smoke poisoning in the tube, there must be well ventilated. Side was the construction. 4. Perimeter deviation and roundness deviation reel see GB50235-97 specifications. 5. Volume control group of welding, welding sparks to note, the construction site to be equipped with fire-fighting equipment, welding arc must be blocked, not harmful to the eyes of other people. Spiral steel pipe, spiral pipe, steel plants, bridges top tube, steel casing, steel coil pipe piling pipe, steel pipe piles, water pipes, billboards column pipe, water piling steel casing pile casing Chaozhou, Guangdong, Guangzhou, Shenzhen, Foshan, Jiangmen, Zhaoqing, Huizhou, Zhanjiang, Maoming, Yangjiang, Meizhou, Shanwei, Heyuan, Qingyuan, Dongguan, Zhongshan, Zhuhai, Shantou, Jieyang, Yunfu, Shaoguan Guangxi Nanning, Beihai, Qinzhou Fangchenggang Guigang Yulin Chongzuo guest Baise, Hechi Hezhou Liuzhou, Guilin, Haikou, Sanya, Hainan Wuzhou Ji'an, Jiangxi Ganzhou, Fuzhou, Shangrao, Yichun spiral galvanized spiral, spiral steel pipe plant, spiral price spiral pipe manufacturers, large diameter steel pipe. Spiral steel pipe, spiral pipe, welded steel pipe, bridge jacking, steel casing, piling pipe, steel pipe piles, water pipes, billboard products provide a sand column pipe, corrosion, zinc, processing |
Admin>>>
You are the 27026 visitor
Copyright © GuangDong ICP No. 10089450, Foshan Shunde Langze Steel Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 27026 visitor
Copyright © GuangDong ICP No. 10089450, Foshan Shunde Langze Steel Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility